Other information:
Removal
NOTE:
Removal steps in this procedure may contain installation details.
NOTE:
The EBB and the ABS module are serviced as an assembly and should not be separated.
NOTE:
The PMI process must begin with the current ABS module installed...
Open the liftgate.
Stop the liftgate movement by pressing
the control button on the liftgate when
it reaches the desired height.Note: Once the liftgate stops moving,
you
can manually move it to the desired height.
Press and hold the control button on
the liftgate until a tone sounds,
indicating programming is complete...